What should we pay attention to when installing nitrogen machine?
Time:2014-09-20 17:33:50 CTR:
What should we pay attention to when installing nitrogen machine?
Q: What should we pay attention to when installing nitrogen machine?
A:
1. The nitrogen machine must be installed on a ventilated and dry horizontal hard ground, more than 1 meter away from other equipment, and must not be installed in the open air.
2. The air source air compressor used with the nitrogen machine can be placed near the machine, in order to reduce noise, the compressor is best isolated, soundproof installation, the foundation of the compressor must be considered according to the load factor requirements of the design (according to the requirements of the air compressor instruction manual).
Q: What should we pay attention to when installing nitrogen machine?
A:
1. The nitrogen machine must be installed on a ventilated and dry horizontal hard ground, more than 1 meter away from other equipment, and must not be installed in the open air.
2. The air source air compressor used with the nitrogen machine can be placed near the machine, in order to reduce noise, the compressor is best isolated, soundproof installation, the foundation of the compressor must be considered according to the load factor requirements of the design (according to the requirements of the air compressor instruction manual).