Nitrogen machine factory teach you how to deal with nitrogen machine emergency
1, the emergency should be calm, is to ensure that the witness insurance, facility conditions, to a minimum degree of injury to the increased event;
2, the emergency is the first time, the relevant units should inform, guide, take effective measures to reduce the damage of the relevant personnel;
3, the principle of what big operators do, charge structure, functional facilities, insurance protection devices, work after the attack, according to the actual situation to develop timely response measures and implementation;
4, the leakage accident should be cut off in time, to protect the personal insurance standard, if the risk and insurance should be timely;
5, the overpressure accident should immediately confirm whether the installation insurance of the facility has failed, if it fails, the pressure source should be cut off or closed, and the safe pressure does not exceed the boundary facility acceptance;
6, after the event occurred 6 sets of blocks, close the pressure vessel overpressure supervision emerged in front of the hand to grasp the medium pressure. Criteria and shake a person to operate, a monitor, timely with the power supply unit timely restoration of power supply; All are attack power outages, should be timely. Calm, control valve manual control valve, open excess medium to prevent overpressure state attack;
7, emergency power failure, should promptly notify the relevant units, relevant personnel, understand the power failure area, is the entire wind system interruption, or all the interruption, and then do not take effective measures to reduce the loss, if the attack serious power failure, should open the deaerator steam inlet valve as soon as possible, and pressure oxygen fragment preservation, open the pump inlet valve, grasp the steam by hand, wait. Call past, with the treatment group whether to restore the system malformation surgery, the loss is related to the training that can eliminate the pressure of preservation, is the ice water, after hardening of the water supply and the malformation, in turn the media sends the sulfide group, with the shake off the pump operating procedures specified, will steam quickly, prevent water;
8, to check the male wind performance in time, it is the longest time to master the manual valve, the gas-closed valve main valve two stations, open the pipeline control gas valve bypass valve, manually adjust the main pressure gauge, one care, one person operation, to ensure insurance;
9, the measurement disc block must immediately tell the electrical measurement technology, switch to the standby circuit, manually control the valve, adjust the pressure, and measure. One person, one care, guaranteed insurance;
10, operators, maintenance personnel must know the function of the emplacement facilities, the role of the operation in strict accordance with the operating procedures is an emergency;
11. Make detailed records of accidents, timely guide reports to subordinate units, write clear records of the event speech and settlement process, and pay attention to observation. Requests the operator's duty tasks, a high sense of responsibility and the owner's material does not distract attention from the task.
1, the emergency should be calm, is to ensure that the witness insurance, facility conditions, to a minimum degree of injury to the increased event;
2, the emergency is the first time, the relevant units should inform, guide, take effective measures to reduce the damage of the relevant personnel;
3, the principle of what big operators do, charge structure, functional facilities, insurance protection devices, work after the attack, according to the actual situation to develop timely response measures and implementation;
4, the leakage accident should be cut off in time, to protect the personal insurance standard, if the risk and insurance should be timely;
5, the overpressure accident should immediately confirm whether the installation insurance of the facility has failed, if it fails, the pressure source should be cut off or closed, and the safe pressure does not exceed the boundary facility acceptance;
6, after the event occurred 6 sets of blocks, close the pressure vessel overpressure supervision emerged in front of the hand to grasp the medium pressure. Criteria and shake a person to operate, a monitor, timely with the power supply unit timely restoration of power supply; All are attack power outages, should be timely. Calm, control valve manual control valve, open excess medium to prevent overpressure state attack;
7, emergency power failure, should promptly notify the relevant units, relevant personnel, understand the power failure area, is the entire wind system interruption, or all the interruption, and then do not take effective measures to reduce the loss, if the attack serious power failure, should open the deaerator steam inlet valve as soon as possible, and pressure oxygen fragment preservation, open the pump inlet valve, grasp the steam by hand, wait. Call past, with the treatment group whether to restore the system malformation surgery, the loss is related to the training that can eliminate the pressure of preservation, is the ice water, after hardening of the water supply and the malformation, in turn the media sends the sulfide group, with the shake off the pump operating procedures specified, will steam quickly, prevent water;
8, to check the male wind performance in time, it is the longest time to master the manual valve, the gas-closed valve main valve two stations, open the pipeline control gas valve bypass valve, manually adjust the main pressure gauge, one care, one person operation, to ensure insurance;
9, the measurement disc block must immediately tell the electrical measurement technology, switch to the standby circuit, manually control the valve, adjust the pressure, and measure. One person, one care, guaranteed insurance;
10, operators, maintenance personnel must know the function of the emplacement facilities, the role of the operation in strict accordance with the operating procedures is an emergency;
11. Make detailed records of accidents, timely guide reports to subordinate units, write clear records of the event speech and settlement process, and pay attention to observation. Requests the operator's duty tasks, a high sense of responsibility and the owner's material does not distract attention from the task.
prev:Activated carbon filter for components of nitrogen generating unit
next:Pressure swing adsorption nitrogen production mechanism Nitrogen requirements for nitrogen purity
Related information
- Application of nitrogen making machine in wire....
- Application of nitrogen-filled fresh-keeping t....
- Application of nitrogen machine in lithium bat....
- Nitrogen machine, nitrogen machine, nitrogen e....
- Application of nitrogen making machine in refl....
- Application of nitrogen making machine in high....
- Application of nitrogen making machine in plas....
- Application of nitrogen making machine in elec....
- Small food packaging nitrogen machine selection
- How to choose nitrogen machine equipment correctly
Leave a comment
Please consciously abide by the policies and regulations related to the Internet, and it is strictly forbidden to publish pornographic, violent and reactionary remarks.
Evaluate: | Good Neutrality Bad | ||||||||||||
Emote: |
|
Code:
Latest comments
Hot article:Nitrogen machine Pressure swing adsorption nitrogen production device | Nitrogen machine maintenance and ammonia decomposition maintenance | Nitrogen machine nitrogen purification equipment | Nitrogen machine operation and maintenance | What are the maintenance precautions of nitrogen machine| PSA nitrogen machine working principle | Working principle of nitrogen machine
Shenzhen Troy New energy Co., LTD©copyright2014
Hot search: Nitrogen machine use PSA nitrogen machine principle PSA nitrogen machine instruction manual Nitrogen machine principle Nitrogen machine operation Nitrogen machine Nitrogen purification equipment Nitrogen machine maintenance Ammonia decomposition maintenance nitrogen machine pressure swing adsorption nitrogen production device
目前共有人访问过本网站
Scan code to get the latest product offers |