Nitrogen machine installation layout requirements

Catalogue:Industry NewsCTR:Time:2014-12-04 10:14:24

Article source:Responsible editor:

Nitrogen machine equipment all equipment liquid nitrogen system without foundation, smooth clean indoor floor. However, for larger air compressors, compressed air drying equipment, such as the basic requirements of the equipment, will have. At the same time, in order to facilitate the maintenance and cleaning of the equipment, the best purification device, air compressor, drying equipment, nitrogen machine, nitrogen ground to do 10cm level table.

制氮机

The nitrogen system is connected to the device in the order before and after the nitrogen process. Before signing the contract, the user shall provide the plant size table or field map and the air inlet and outlet location of the product nitrogen equipment after installation, within one week the contract will be signed according to the actual user of the site connection diagram, in the equipment of my company, equipment layout to provide the set of nitrogen system users.

In general, plant equipment is arranged along the wall. Air compressor, cold and dry machine should be placed in the outlet or well-ventilated place, if there is an air compressor, no air storage tank air compressor, the distance between the cold and dry machine should be as large as possible, the length of the pipeline between the two as long as possible for some time, through the atmosphere in order to reduce the temperature of the compressed air. The distance between each device should be at least 1m, the distance between the device and the wall should be at least 0.8m, and the operation of the ground equipment should be oriented to the convenient operation range for personnel to operate, maintain, and repair the equipment.

The pipe connection between the devices should replace the actual situation of all the devices, so the user is responsible for the pipe connection. All hardwired modes are best used for wire (threaded or welded), by professional construction to avoid the phenomenon of leakage.


            【Large Normal Small
Leave a comment Please consciously abide by the policies and regulations related to the Internet, and it is strictly forbidden to publish pornographic, violent and reactionary remarks.
Evaluate: Good Good Neutrality Neutrality Bad Bad
Emote:
Code: Refresh verification code  
Latest comments
Shenzhen Troy New energy Co., LTD©copyright2014    
Hot search: Nitrogen machine use PSA nitrogen machine principle PSA nitrogen machine instruction manual Nitrogen machine principle Nitrogen machine operation Nitrogen machine Nitrogen purification equipment Nitrogen machine maintenance Ammonia decomposition maintenance nitrogen machine pressure swing adsorption nitrogen production device

粤公网安备 44030902001891号

目前共有人访问过本网站
Scan code to get the latest product offers
Scan code to get the latest product offers